NORDIC OFFSHORE :

Sleipner - Grane trenching

Nordic Offshore performed trenching of the newly laid fibre optical cable between the Sleipner and Grane fields in Norway during August.

The original workscope was burial of cable crossings along the route - this was later on extended to burial of a total of 55 km cable.